Parand Pump Station

Location: Tehran

Capacity: 5,000m3/day

Employer: Tehran water & wastewater Company

Supervisor: Rayab Consulting Engineering

Date of starting: 2010

Parand Pump Station

Brief specification of treatment process

Two horizontal centrifugal pumps have been used in the pumping station plans. The pumping station includes six mainelectro pumps and one pump as a reserve, which are planned for the primary stage. For the final stage, there are eightmain pumps with two reserve pumps. Each pump has a flow rate of 278 Liter/s (1000m3/s) with a hydraulic head of 77m.